The first batch (414-435) of these C420s were purchased as part of the post-merger dieselisation of the TdM & LT&L. The second batch (469-482) were acquired second-hand when the PV&T bought the D&H in 1984, and a third batch started trickling in as various Alco-powered shortlines started retiring their no-longer-even-close-to-EPA-conformant historic locomotives.
All of these centuries remain in service.
In the 2020s, they started to be rebuilt at ILW with modern internals and a Tier 4f prime mover (a Cummins QSK50 diesel). This program was slowed by the China Tunnel Project, but by the mid 2020s half of them had been remanufactured.